An explosion-proof legged robot for industrial use costs about $200,000 for the robot alone, before docking, software and onboarding. Global Info Research puts the 2025 segment average at about $258,460 per unit on only about 65 units sold, according to its June 2026 market report.
An explosion-proof legged robot is a walking quadruped certified to work where flammable gas may be present. ANYbotics introduced ANYmal X to automate inspections in oil, gas and chemical plants. ANYmal X holds ATEX and IECEx certification for Zone 1 areas where flammable gas is likely during normal operation.
Table of Contents
- Why is there no list price?
- What does the market actually pay?
- How does a non-Ex robot compare?
- What must an industrial budget cover?
- Will Zone 1 approval cover your plant?
Why is there no list price?
ANYbotics publishes no list price for ANYmal X. Robot Price Index reports it sells only as a quoted enterprise deployment, according to its September 2026 pricing guide.
That quote covers the robot plus docking, software and onboarding. Buyers should request a site-specific quote rather than plan around a sticker price.
What does the market actually pay?
Independent tracking places a standard ANYmal at about $150,000 to $200,000. It places the Ex-proof ANYmal X at the top of that range before services, according to Robot Price Index.
The 2025 market average was higher because most sales were complete hazardous-area systems in very low volume. Expect the final enterprise cost to exceed the robot-only estimate once integration is added.
How does a non-Ex robot compare?
Boston Dynamics Spot costs about $100,000 base and up to $300,000 with payloads, up from $74,500 at 2020 launch. The figures come from the Boston Dynamics CFO, as reported by WebProNews.
A July 2026 DHS SAVER assessment priced a Spot evaluation unit at $135,000 base and about $325,000 fully equipped. That unit added CBRN, thermal and arm payloads, according to Whirrwork. Payloads can therefore double or triple the base robot cost.
What must an industrial budget cover?
Plan the deployment as a system, not a single robot purchase. Site work and software often decide the total.
- Robot and Ex-proof protection package
- Docking station and hazardous-area power and networking
- Inspection software, integration and onboarding
- Sensors, cameras, gas detection and other payloads
- Maintenance, spares and operator training
Will Zone 1 approval cover your plant?
ANYmal X is rated only up to Zone 1 IIB gas. It excludes IIC hydrogen and acetylene areas, according to Robo2u.
That limit has direct budget impact. Buyers must verify the gas group for each inspection route plus budget for hazardous-area infrastructure. Check your area gas-group map and power plan before requesting a quote.



